Work I can show

One product of my own, then projects from my current role at a brewing and beverage equipment distributor running Sage 100 and two Magento stores, September and October 2026. No names; the numbers are real.

AdapterBuilder: a parts finder built from 17,697 messy product listings

My own product. Live at adapterbuilder.com · How it selects parts

17,697

product listings collected and sorted by their two ends. The finder uses only the ones that state both ends clearly.

Problem
Adapters and fittings are sold under titles like “1/4 Inch Barb x 1/2 Inch NPT, Brass Air Hose Fittings (2 Pack)”. The facts that matter (thread standard, size, and whether each end is male or female) are somewhere in that free text, written a dozen ways, when they're there at all. I wanted a tool that starts from the two ends you already have and finds the parts that join them.
What I did
Collected the listings into one database. A parser groups the titles into families, and each candidate listing then gets its own review: both ends, material and pack count. New listings get in only when the parser and the review agree and both ends are stated clearly. The parts that pass form a typed graph, and a shortest-route search chains up to four of them, rigid parts first, a hose only when a real hose with the right inside diameter and a stated length exists.
Result
Over 2,500 parts so far, with a review of every listing under way. 14 connection standards, from NPT and garden hose thread to tri-clamp, cam-and-groove and PEX, in sizes from 1/8 inch to 4 inches. Each result comes with a connection diagram, the assembly order and a parts list. 120 automated tests route every published part in both directions. It runs on free static hosting with no server-side search.
Lesson
Most of the data wasn't good enough, and saying so is part of the product. A listing that doesn't state both ends stays out, so a missing result means “no match in the catalog”, never a wrong part. A distributor's catalogue needs the same job.
AdapterBuilder connection diagram: 1/4 inch NPT female, a hose barb fitting, a 1/4 inch hose, and a second barb fitting to 1/2 inch NPT.
A real result from the live site: 1/4 inch NPT female to 1/2 inch NPT female in three parts, with a hose. Drag sideways to see the whole diagram, or tap it for full size.

Python · SQLite · graph search · Cloudflare Pages

What was stopping web orders: six checkout faults traced from vague complaints

Full write-up: how I traced them, fault by fault

$45,000 a month

of carts the fixes are worth at the most conservative count: 71 orders a month, about 8% of web orders.

Problem
Web orders had been soft for weeks, and customers kept phoning in orders because the website wouldn't let them check out. The complaints were real but vague: “my card doesn't work”, “it won't let me verify my address”. Of 23 reports in two weeks, only three still ended in a website order.
What I did
With read-only access to the store's database, error logs and web server logs, I took each complaint, found the shopper in the records, worked out what the site actually did to them, and counted everyone else it did the same thing to. Six faults came out of it, from a tax add-on crashing at Place Order to the web host blocking current versions of Chrome as bots.
Result
All six fixed by the agency and the host. Counting only shoppers who never ordered anywhere, the fixes are worth at least 71 orders and $45,000 of carts a month. About 36 more orders a month no longer need the sales desk to take them by phone.
Lesson
Read the customer's own words, not the summary. “My card doesn't work” was a card the bank had approved and the site had cancelled.

Magento 2 · server and error logs · SQL · Python · ERP order history

Web orders that check themselves before the picking sheet prints

389 of 406

web orders over two weeks where the ERP, the web store and PayPal agreed, so the picking sheet printed without anyone comparing three screens.

Problem
Between a web order arriving and its invoice printing, one person did five hand jobs in the ERP's own screens: printing the picking sheet, typing the PayPal ID and the customer's PO number, putting back the freight the customer actually paid, and typing country-of-origin lines on export invoices. Two separate tools covered parts of it, each with its own login.
What I did
Measured every rule against production first, then built one app for that desk. It reads the ERP, asks the web store and PayPal only about orders still waiting, and prints the sheet when every check passes.
Result
The app held the 17 orders that didn't pass, each with a reason a person can act on. One 265-second run filled in country of origin on 5,195 items, then read them back: 5,195 of 5,195.
Lesson
Check what a “read-only” step really changes. The ERP's test print marked the order as printed.

Sage 100 BOI · Magento REST · PayPal API

A quantity discount that kicked in one unit early

$26,268

in discount given away over 12 months, because the ERP treats each price break as the last quantity in its band, not the first.

Problem
A January price import wrote the tiers on 740 items so that a customer buying 2 got the price for 5. No order looked wrong on its own.
What I did
Proved the rule on one sales order, rebuilt every ladder from the web store's prices, and read each one back.
Result
Items starting a tier early went from 740 to 229, and each remaining one has a reason (149 are meant to start at 2). In the same pass: 1,885 duplicate customer records merged into the right accounts, 858 dead purchase orders purged with no change to the general ledger, and a product line found posting inventory to accounts payable for 11 months.
Lesson
Check a reused item code by name before writing to it. One number meant a filter sheet in the ERP and a labeling machine on the web.

Sage 100 · Visual Integrator · SQL

PayPal receipts: from two hours a week to 31 seconds a deposit

31 seconds

to enter 53 PayPal receipts into the ERP, a job that had taken at least two hours a week by hand.

Problem
Someone had to match every PayPal payment to its invoice, key it as a cash receipt with the fee worked out, then fix the deposit by hand before it would post. Payments with no invoice sat in a pile for weeks.
What I did
Built a dashboard that works one PayPal bank transfer at a time, because a transfer ties to the bank to the penny and a date range doesn't. It matches every payment, holds back the ones about to be refunded, and enters the rest through the ERP's own business objects, so the deposit balances itself.
Result
Re-running six months of past postings, 1,542 of 1,579 came out identical. About 100 hours a year back, counted as a floor. The stuck payments turned out to be orders that hadn't shipped, not cash problems, and each one now says whose job it is.

PayPal API · Sage 100 BOI

The checkout bug the error log knew about for weeks

8 weeks

how long a payment option had been broken at checkout when the new error watch flagged it on its first morning.

Problem
Logged-in customers couldn't place orders. The site wrote every failure to its error log, which grows by 144 MB a day and which nobody reads. A customer service rep found it by accident.
What I did
Built a watch in a day. It groups the log into kinds, explains each new kind in plain English, and emails only when something needs doing.
Result
Its first run read 14 days of history: 110,687 entries became 77 kinds, and the 2 it rated high were both payment failures at checkout. It costs about $3 a month to run, against about $70 for the commercial alternative.
Lesson
Treat its reading of a problem as a lead to check. It blamed the host for two outages that were really the agency's own deploys, so every email says “not verified”.

Magento logs · SSH · PowerShell

Spending a small buying budget on what sells back first

$43,120 vs $0

forecast sales back within 112 days from the same $20,000, ranked by cash conversion against ranked by margin at risk.

Problem
Buying ran on a spreadsheet that went stale the moment it was exported, plus the ERP's static reorder points and memory.
What I did
Built a purchasing dashboard from the ERP's own ledgers: demand corrected for days out of stock, lead times measured from actual receipts, and a buy list that spends a fixed budget on what sells back soonest.
Result
$56,594 of proposed purchases stopped, because the warehouse builds those items from parts already on the shelf. Back orders had been read as demand spikes, and fixing that lowered the forecast on 155 items.
Lesson
A dashboard can say what to buy. Someone still has to place the order, and that routine is the next fix.

Sage 100 ledgers · Python

Also

Freight quotes
Phone and email orders made 12% on freight against 31% on the web. A rate card set near the 85th percentile of carrier cost now covers about 76% of offline parcel quotes, roughly 93 hours a year of lookups.
Reporting tied to the ledger
Every margin figure on the dashboards read six points low, because kit part cost was counted twice. Fixed, and the product-line view now ties to the executive view to the cent.
Manuals and drawings
Products with a downloadable document went from 347 to 1,887, mostly by linking one file to many products instead of uploading copies.
Catalogue repairs
Products visible in the store with no working page address went from 128 to 0, and 829 garbled text values were repaired. Every change was logged with a way to undo it.
Site search
Measured both engines on 115 real customer queries before switching off a paid add-on. The noise was a hidden keyword field: 74,726 tags, and 1,299 products tagged “brewing”. Results for “butterfly valve” went from 1,011 to 243.

Experience

Fifteen years, most of it as the person between departments. Employers aren't named here. Ask and I'll tell you.

2026 to nowBrewing and beverage equipment distributor

VP

  • The work above, plus product data enrichment: keywords, descriptions, categories and 50 fields of metadata so customers can filter the catalogue.
  • Planning the ERP's move from ProvideX files to a cloud SQL Server.
  • A new CRM instance tied into the website, with the processes to go with it.
  • Sales, product movement, revenue and purchasing analysis from my own SQL exports.
  • Website guides and calculators, and site fixes tracked as tickets.
2022 to 2025Private-equity-backed group of beverage equipment companies

General Manager; VP of Engineering and IT; VP of Special Projects

  • Local lead for closing a plant: planned it with the owners and management team, ran the move-out, and drove the forklift that loaded the last crates.
  • Led two more site closures and the wind-down of an assembly operation: announcements, contingency planning, move-out, moving product lines into a sister company, and support after closing.
  • Moved machine assembly knowledge and process to another plant, then kept supporting assembly and customers. Held part numbers and suppliers fixed during the move so the documentation chain survived.
  • ERP selection committee and deployment team: process design, data migration, on site for start-up at two plants. Later stood up a separate instance so the distributor could ship a closed brand's products, then moved that inventory into its own ERP and web store.
  • Built ERP reporting nobody could get before: learned the import tool, mapped the database tables and automated the exports.
  • Rolled Aircall out to multiple sites after the buyout; built the CRM's service tickets and process; managed the web store's development with an outside agency.
  • My first time running a canning line in a brewery was my first install, done solo on a model I had never built, including repairing its factory defects on site. It went fine.
2018 to 2023Beverage packaging equipment manufacturer, later bought by the group

Project Manager, Service Manager, Engineering Manager

  • Often all three at once: customer requirements, field installs and training, tier 1 and 2 support, field service, and a team of four engineers.
  • Supported customers' canning lines for years before I had ever run one in a brewery, on engineering background and troubleshooting alone.
  • Built the service ticket database and fed ticket trends back into engineering.
  • Helped choose and move the ERP from Pedyn to Odoo, then ran its upkeep, development and processes.
  • Moved the phones to a self-hosted 3CX system I deployed and ran myself, then to Aircall.
  • Product manager for four products; process development in every department; two years on the management board.
2016 to 2018Satellite communications hardware manufacturer

Program Manager

  • Up to nine contracts at once, worth up to several million dollars, for aerospace prime contractors and a NASA lab.
  • Led RF, electrical and mechanical engineers, machinists and technicians; reviewed contracts and negotiated spec compliance and terms directly.
  • The one program manager who ran project calls without the lead engineer; troubleshot high-vacuum test chambers; schedules, cost and burn-down tracking in MS Project.
2015 to 2016Engineering services, contract

Engineering Consultant

  • Project engineering, product development and automation; PLC and HMI work on Allen-Bradley and Opto22.
2011 to 2015Pharmaceutical freeze dryer manufacturer

Project Manager and Engineer

  • Freeze dryers built to GMP, projects from $25,000 to $800,000: PLC code for the whole product line, panel design and wiring, factory and site acceptance tests, IQ/OQ documents, 21 CFR Part 11, GE iFIX SCADA.
  • Built a vial filler on a CNC router base with a custom Mach3 interface, and a VB.NET program that plans the fill path for hundreds of vials in four tray layouts, corrected for tray skew.
  • Installed freeze dryers in the field and trained customers' operators, including abroad.
  • Trained three junior engineers and ran the company's IT, servers included.
2008 to 2009Firearms manufacturer; materials testing

Engineering co-op, then field technician

  • Found a shotgun ejection fault with high-speed cameras (a weak spring) and traced a trigger notch defect to broach tooling.
  • Automated serial number updates in a legacy database with AutoIt and purchasing spreadsheets with VBA, and built the plant's first supplier quality database.
  • Helped lay out and move production lines, including the line for a newly acquired rifle brand.
  • Then a recession year testing asphalt density in the field.
Education
BS, Mechanical Engineering Technology (ABET accredited), Rochester Institute of Technology, 2010.

Systems I've worked in

Where I've been, not a limit. If it holds data or runs a machine, it can be connected.

ERP
Sage 100 (ProvideX ODBC, Business Object Interface, Visual Integrator, SQL Server), NetSuite, Odoo, Pedyn, SAP, QuickBooks.
Web and e-commerce
Magento 2 (REST API, multi-store), Cloudflare, Google Analytics 4.
CRM and sales
HubSpot, Klaviyo, QuoteWerks.
Ads and product feeds
Google Ads (campaign design, build, budgets, monitoring, search terms), Google Merchant Center (catalog feeds: GTINs, product categories, field mapping).
Phones and office
3CX (self-hosted), Aircall, Vonage, Quo, Office 365 and Exchange, SharePoint, Zapier, Jira.
Payments, tax, freight
PayPal, Vertex, FedEx.
Reporting and data
Microsoft SQL Server, Metabase, Power BI, Crystal Reports, Access, Excel.
Industrial automation
Allen-Bradley CompactLogix and RSLogix 5000 (ladder, structured text, function block), Opto22 PAC, GE iFIX SCADA, HMIs and drives, Mach3, Arduino.
Engineering
SolidWorks, Inventor, AutoCAD, MS Project, Visio.
Code
Python, PowerShell, SQL, JavaScript, VB.NET, VBA, AutoHotkey.
Regulated work
GMP and cGMP, FDA 21 CFR Part 11, IQ/OQ, factory and site acceptance testing.
Hands-on
TIG and MIG welding, manual mill and lathe, CNC routing and plasma, 3D printing, panel layout and wiring.

Free tools and references

Sage 100 ODBC reference
How to query Sage 100 from PowerShell and run it unattended. Also as a Word document.
Carbonation calculator
A sea-level carbonation chart, corrected for elevation and ABV, built for a brewing supplier's store.
Floor plan builder
Lay out a warehouse in the browser.